raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

Mario's pizza has two choices of crust: deep dish and thin-and-crispy. the restaurant also has a choice of 5 toppings: tomatoes, sausage, peppers, onions, and p
What is a segment bisector
A supplier is producing a machined part for the transmission of your vehicle. the upper specification limit is 0.125 cm and the lower specification limit is 0.0
A body goes from P to Q with a velocity of 10 m/s and comes back from Q to P with a velocity of 20 m/s. What is the average velocity of the body during the enti
Psychologists define the term _____ as a complex psychological state that involves subjective experience, a physiological response, and a behavioral or expressi
Evaluate [(51 + 3) − 3²] ÷ 9 ⋅ 2.
True or false: scientifically 'perfect' research designs can be limited only by money and time constraints.
How was the tiger trapped? Change into active voice
Sleep disturbances interfere with the ________ of memories. suggestibility consolidation misattribution persistence
Hee Sun drew an electron dot diagram of a silicon atom as shown. In addition to changing the symbol to C, how would this diagram compare with an electron dot