Chan592 Chan592
  • 03-02-2019
  • Physics
contestada

Determine the amount of work done when a crane lifts a 100-N block form 2m above the ground to 6m above the ground

Respuesta :

hrzlatevski
hrzlatevski hrzlatevski
  • 03-02-2019

Data given:

F=100N

Δx=6m-2m=4m

A=?

Formula needed:

A=F×s

Solution:

A=100N×4m

A=400J

Answer Link

Otras preguntas

The width of a rectangle is 6 ft. What os the perimeter of the rectangle if its area is 42 square feet? A 26 feet B 36 feet C 42 feet D 48 feet
If the circumference of a circle is 11 pi inches, what is the area? round your answer to the nearest hundredth.
4 glue sticks cost $7.76 Which equation would help determine the cost of 13 glue sticks?
5 1/6-2 3/8-2/4??????? how to do
7,000lbs times what would equal 3.5 tons
This present-day nation was home to the Ottoman Empire.
Which type of information is best represented by a chart?
You can draw a quadrilateral with two sets of parallel lines and no right angles. True False
What is 75.4 in terms of π? a) 12π b) 36π c) 24π d) 144π
Statements such as always, everybody, and never are cue words for which of the following? A. emotional appeals B. overgeneralizations C. ethical concerns D.