Which term describes the complexity of a document

Respuesta :

narstarolor
narstarolor narstarolor
  • 06-11-2020

Answer:

Work breakdown structure (WbS)

Explanation:

A work-breakdown structure in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections, and also defines its complexity.

Please let me know if this helped

Answer Link

Otras preguntas

How many minutes are in 36 hours?
Trying to translate word problems. Five times the sum of 3 and twice some number is 70. what is the number?
A passenger on a boat moving at 1.70 m/s on a still lake walks up a flight of stairs at a speed of 0.60 m/s , as shown in the figure . The stairs are angled at
A passenger on a boat moving at 1.70 m/s on a still lake walks up a flight of stairs at a speed of 0.60 m/s , as shown in the figure . The stairs are angled at
What is a direct combination reaction?
Solving systems by elimination: 2x + 4y = -4 3x + 5y = -3 Please show me your work so I can do the rest myself. Thanks!
When was William Shakespeare born
is it possible for a distance versus-time graph to be a vertical line?
in what ways is climate controlled by the sun and the water cycle ?
in an expression(8/9) squared (-81)+3/5dividedby-9/10