Seudónimo Seudónimo
  • 02-06-2018
  • Mathematics
contestada

It takes 10 workers 24 hours to do a job.
Fill in the chart.

It takes 10 workers 24 hours to do a job Fill in the chart class=

Respuesta :

biggersis1968p8xgn0 biggersis1968p8xgn0
  • 02-06-2018
5 in 48 
10 in 24
20 in16
30 in12
40 in 8
50 in 4
Answer Link

Otras preguntas

)How can the function abcfunc change the contents of intpoint, and have that change seen by the calling program? a)Recode abcfunc and pick up the parameter by r
In the following description, the narrator describes the relationship between Rip and his wife, Dame Van Winkle. Which underlined phrase shows how the Dame’s b
28. Volcanoes effect A. atmosphere B. biosphere C. geosphere D. hydrosphere E. all of the above
what is the leading term of the following polynomial? f(x)=5x4-3x3+9x2+6x-7 A.5x4. B.-3x4. C.9x2. D.6x​
Find the inverse for the function f(x)=4x+12​
A coil has an inductance of 5 H and a resistance of 20 Ω. If a DC voltage of 100 V is applied to the coil, find the energy stored in the coil when a steady maxi
How do I write 8 1/6 divided by 2 1/24 in simplest form?
"It was a torment to him to waste a day of his careful self-training, but he stayed with her on that other beach, which now seemed a place for small children, a
What did the Congress ask states to do during the revolutionary war?
a _ _ has a definite composition that will not vary